General information
- Address: J.W. Lucasweg 35, 2031 BE Haarlem, The Netherlands
- Area: 40,000 sq.m. gross surface
- Power capacity: 15 MW (expansion to 60 MW)
- Quality level: Tier III
Facility details
Power supply system
- Power capacity - 25 MW (expansion to 60 MW)
- Generators: 25 Megawatts
- Power redundancy options N+1 and 2N
- 8 power transformers with 2500 kVA
- 16 automatic DGUs x 1540 kVA (N+2)
- 1.2 PUE (power usage effectiveness)
- 48-hour fuel reserve
-
99.99999% uptime since 2007
Cooling
- Cooling system with 2N redundancy
- Using freecooling
- Hot and cold corridors
- Temperature 24°C (± 5°C)
- Relative humidity 50% (± 25%)
Fire Extinguishing
- High-sensitivity smoke detection system VESDA (Very Early Smoke Detection System)
- FirePro® / IG55 gas fire extinguishing system
- Portable gas and foam extinguishers
- Fire resistance of walls 1 hour
Security
- On-Site Security Personnel 24/7
- 3-meter-long electric fence across the perimeter of the data center building.
- Guarded access to the territory, pass control
- Complete monitoring of the entire territory of the facility with video cameras with motion sensors
- Entrance to the guarded reception area via gateway booths equipped with ID card readers, access cards and biometric data (palm print scanning).
- Entrance to the machine rooms is via access cards and biometric data reading (palm print and retina scanning).
- Corridors, entrance doors and other critical infrastructure are controlled by the CCTV system.
Certificates
- ISO 27001:2005 (Information Security Management System Certification (equivalent to NEN 7510))
- ISO 9001:2008 (Quality Management System Certification)
- ISAE3402 (SAS 70) (audit opinion on financial and internal control)
- NEN 3140; 1010; 50110 (low voltage protection)
- Borg Class 4 (construction and electronic network security)
- AMS-IX Certified Data Center for AMS1
- U.S. Green building council LEED Gold